Effective and cost efficient design has an important place in Facade Architecture.
- Detail Design
It is the process of creating application details by considering the structural elements that the curtain walls interact with.
Following a serious measurement and static calculation phase, detail design are created using two or three dimensional modeling programs.
- Shop Drawings
Shop drawings are the drawings that are formed following detailed design is created and approved by the Employer, and in which all kinds of facade elements are sized, dimensioned and explained how to produce.
-Installation Projects
They form the project studies that explain how to install the facade elements manufactured at the job site.
It is a logical study that shows how the process will be handled, how long the processes will take and their interactions following the contract signing phase.
By assigning resources to the processes, the progress of the project is controlled and it is ensured to be successful.
Thanks to its experienced staff and advanced softwares such as Primavera, Modal Contruction regularly carries out its planning activities.
The supply chain starts with the purchasing process from nominated and recognised suppliers, according to the work Schedule and specifications, during the production and installation phases and continues until the Project completed.
Carry out purchases that form a chain with each other according to the work schedule is an important factor for the success of the Project.
Logistics activity is the process of delivering materials and equipment needed in both manufacturing and installation stages to domestic and international locations in a timely and safe manner.
Modal Construction carries out logistics activities with its expert staff and ERP programs.
All system components related to the “project to be built” are manufactured in Modal Contruction’s factory located in Kocaeli, in strict quality conditions and by means of its advanced machinery and experienced staff.
Modal Construction believes that no changes or alterations on Site Drawings are acceptable at installation stage and pays utmost importance to early site studies, material management and site management.
Modal Construction carries out installation activities with strict complience to drawings and specifications by means of it’s experinced installation staff and site management paying utmost attention on quality, OHS and planning during the course of the Project.
Quality system documentation, assembly methodology, OHS documentation, risk analysis, planning works are completed and put into force by the field management staff before the installation process.
Even if the completed projects have been put into operation by the Employer, Modal Contruction bears the responsibility to provide service during and after the maintenance period and carries out the necessary servicing operations.